Heritage landmarks, commercial refurbishments, residential schemes and infrastructure — a selection of recent work.

Access scaffold and pavement gantry for a corner-site refurbishment behind London Bridge station. Monarflex-clad with full pedestrian protection on one of London’s busiest streets.

Bespoke vehicle access gantry serving second, third and fourth floor loading bays on a restricted residential new-build site. Carefully sequenced around live operations.

Bespoke heritage scaffold on one of London's most iconic landmarks. Full access to the curved terracotta façade, handed over in just two weeks.

Bespoke Layher access and hanging scaffold for high-level signage removal at the former Bank of America building. Weekend closures, full material tethering at height.

Cuplok system scaffold for a 237-home, nine-storey residential development in Wembley. Full perimeter access coordinated with the concrete frame programme for Wates Group.

Large-scale temporary roof on a commercial rooftop in central London. Apollo X-Beams, dual-direction Niko rails and hoists, delivered under a tight winter programme.

Gantry, hanging scaffold and temporary roof for Seaford House in London’s West End. Three scaffold systems coordinated into one package.

Heavy-duty protection gantry designed for 10kN/m² loading with fire-rated steel boards and Layher public access staircase as secondary fire escape.

Highly complex access scaffold for the Grade I listed LSO venue. Freestanding system with engineered buttress frames — no ties into the historic fabric.

Temporary roof scaffold for a central London commercial refurbishment. Full wind analysis and ULS load transfer calculations included.

Bespoke scaffold for a large residential refurbishment with complex roof geometry and restricted access.

Refurbishment scaffold in Soho with restricted pavement access and Westminster City Council highway licence documentation.

Heritage scaffold for the ENO's iconic West End theatre. Heavy-duty pavement gantry and full-height dome scaffold with bridged bays.

Large-scale freestanding LAYHER scaffold and full temporary roof for the 1842 Garda Headquarters. No ties into the listed structure.

NASC award-winning scaffold at the top of Europe’s tallest building. Cantilevered access scaffold and 2-tonne lifting gantry at levels 81-91, all transported manually above level 78.

Full perimeter scaffold and large-span temporary roof for a Grade II* listed civic building. Pavement gantry and bespoke bridge beams over fragile roof structure.

Bespoke access scaffold for a large mixed-use development in the heart of London, coordinated across multiple work packages.

Riverside scaffold for balcony replacement on the Thames. PLA permits, tidal windows, and daily working restrictions in a demanding environment.

Rolling cantilevered roof platform for BMU hydraulic arm replacement. New arm delivered by helicopter lift — zero disruption to occupants or public.